{"id":1336,"date":"2020-12-23T05:14:27","date_gmt":"2020-12-23T05:14:27","guid":{"rendered":"http:\/\/water-climate.kg\/?p=1336"},"modified":"2020-12-23T05:19:28","modified_gmt":"2020-12-23T05:19:28","slug":"invitation-for-bids-2","status":"publish","type":"post","link":"https:\/\/water-climate.kg\/?p=1336&lang=en","title":{"rendered":"Invitation for Bids"},"content":{"rendered":"\n<p>State Agency for Water Resour\u0441es under the Government of the Kyrgyz Republic<\/p>\n\n\n\n<p>Date: December 21, 2020<br>Loan \u2116 3746 KGZ \/Grant \u2116 0632 KGZ Climate Change and Disaster-Resilient Water Resources Sector Project<br>Contract No. NCB \u2116 DWR-W-NCB-1 Off-farm canal and ancillary works for Pravaya Vetka irrigation system.<br>Deadline for Submission of Bids: February 8, 2021 15:00 (Bishkek time).<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>The Kyrgyz Republic has received financing from the Asian Development Bank (ADB) toward the cost of Climate Change and Disaster-Resilient Water Resources Sector Project. Part of this financing will be used for payments under the Contract named above. Bidding is open to Bidders from eligible source countries of ADB.<\/li><li>The State Agency for Water Resources under the Government of the Kyrgyz Republic (\u201cthe Employer\u201d) invites sealed bids from eligible Bidders for off-farm canal and ancillary works for Pravaya Vetka irrigation system. (\u201cthe Works\u201d).<\/li><\/ol>\n\n\n\n<p>\u2022 Rehabilitation of concrete cladding and replacement of cladding using gabions for monolithic concrete and reinforced concrete;<br>\u2022 Rehabilitation and reconstruction of mudflow structures;<br>\u2022 Rehabilitation, replacement or construction of controlling structures on the canal;<br>\u2022 Rehabilitation or construction of water measuring posts.<\/p>\n\n\n\n<ol class=\"wp-block-list\" start=\"3\"><li>Open competitive bidding will be conducted in accordance with ADB\u2019s Single-Stage: One Envelope bidding procedure and is open to all Bidders from eligible countries as described in the Bidding Document.<\/li><li>Only eligible Bidders with the following key qualifications should participate in this bidding:<\/li><\/ol>\n\n\n\n<p>\u2022 Minimum average annual construction turnover of KGS 140 000 000, calculated as total certified payments received for contracts in progress or completed, within the last 3 years.<\/p>\n\n\n\n<p>\u2022 Participation as a contractor, or subcontractor, in at least one contract that has been successfully or substantially completed within the last 3 years and that is similar to the proposed works, where the value of the Bidder\u2019s participation exceeds KGS 80 000 000.<\/p>\n\n\n\n<ol class=\"wp-block-list\" start=\"5\"><li>To obtain further information and inspect the bidding documents, Bidders should contact:<\/li><\/ol>\n\n\n\n<p>Attention: Nabiev Nurlan Burhanovich, PIU Director<br>Address: <strong>720055, 4A Toktonalieva Street, floor # 3, room # 328<br>Bishkek, Kyrgyz Republic<\/strong><br>Tel: <strong>+996 312 54 90 72<\/strong><br>E-mail: <strong><a href=\"mailto:ccd-rwrsp@water.gov.kg\">ccd-rwrsp@water.gov.kg<\/a><\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\" start=\"6\"><li>To purchase the bidding documents in English, eligible Bidders should<\/li><\/ol>\n\n\n\n<p>\u2022 write to the address above requesting the Bidding Documents for Rehabilitation off-farm canal and ancillary works for Pravaya Vetka irrigation system in Nooken District, Jalalabad Region.<br>\u2022 pay a nonrefundable fee of USD 100 or KGS 7000 by bank transfer to the following account:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Name<\/td><td>Project Implementation Unit Climate Change and Disaster-Resilient Water Resources Sector Project<\/td><\/tr><tr><td><\/td><td><strong>Currency KGS<\/strong><\/td><\/tr><tr><td>TIN<\/td><td>01803199710084<\/td><\/tr><tr><td>BIC<\/td><td>135001<\/td><\/tr><tr><td>Account in KGS<\/td><td>1350108039435913<\/td><\/tr><tr><td>Bank name and address<\/td><td>OJSC Aiyl Bank, 720040, 14, Logvinenko Street, Bishkek, Kyrgyz Republic<\/td><\/tr><tr><td><\/td><td><strong>Currency USD<\/strong><\/td><\/tr><tr><td>INTERMEDIARY BANK<\/td><td>SWIFT: IRVTUS3N<br>THE BANK OF NEW YORK MELLON, NEW YORK<\/td><\/tr><tr><td>BENEFICIARY BANK<\/td><td>SWIFT: AIYLKG22<br>ACCOUNT: 30111840000000001224<br>NAME: AIYL BANK<\/td><\/tr><tr><td>Account in USD<\/td><td>1350108032850522<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<ol class=\"wp-block-list\" start=\"7\"><li>Deliver your bid<\/li><\/ol>\n\n\n\n<p>\u2022 to the address: 4A Toktonalieva Street, 3 floor room # 328, Bishkek, Kyrgyz Republic<br>\u2022 on or before the deadline: <strong><span class=\"has-inline-color has-vivid-red-color\">February 8, 2021 &#8211; 15:00<\/span><\/strong> (Bishkek time).<br>\u2022 together with a Bid Security as described in the Bidding Document.<\/p>\n\n\n\n<p>Bids will be opened immediately after the deadline for bid submission in the presence of Bidders\u2019 representatives who choose to attend.<\/p>\n ","protected":false},"excerpt":{"rendered":"<p>State Agency for Water Resour\u0441es under the Government of the Kyrgyz Republic Date: December 21, 2020Loan \u2116 3746 KGZ \/Grant \u2116 0632 KGZ Climate Change and Disaster-Resilient Water Resources Sector ProjectContract No.<a class=\"moretag\" href=\"https:\/\/water-climate.kg\/?p=1336&#038;lang=en\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":1331,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7,17],"tags":[],"class_list":["post-1336","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-tenders"],"views":3578,"_links":{"self":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/1336","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1336"}],"version-history":[{"count":1,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/1336\/revisions"}],"predecessor-version":[{"id":1337,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/1336\/revisions\/1337"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/media\/1331"}],"wp:attachment":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1336"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1336"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1336"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}