{"id":1635,"date":"2022-07-12T10:57:21","date_gmt":"2022-07-12T10:57:21","guid":{"rendered":"https:\/\/water-climate.kg\/?p=1635"},"modified":"2022-07-12T10:57:21","modified_gmt":"2022-07-12T10:57:21","slug":"invitation-for-bids-4","status":"publish","type":"post","link":"https:\/\/water-climate.kg\/?p=1635&lang=en","title":{"rendered":"Invitation for Bids"},"content":{"rendered":"<p>State Agency for Water Resour\u0441es Services under the Ministry of Agriculture of the Kyrgyz Republic<br \/>\n<strong>Date:<\/strong> July 12, 2022<br \/>\n<strong>Loan<\/strong> \u2116 3746 KGZ \/<strong>Grant<\/strong> \u2116 0632 KGZ Climate Change and Disaster-Resilient Water Resources Sector Project<br \/>\n<strong>Contract No.<\/strong> NCB \u2116 SAWR-W-NCB-5 Off farm canal and ancillary works for Pravaya Vetka Canal Head Regulator and Kara Unkur Sai River Headworks<br \/>\n<strong>Deadline for Submission of Bids<\/strong>: August 15, 2022 15:00 (Bishkek time).<\/p>\n<ol>\n<li>The Kyrgyz Republic has received financing from the Asian Development Bank (ADB) toward the cost of Climate Change and Disaster-Resilient Water Resources Sector Project<em>.<\/em> Part of this financing will be used for payments under the Contract named above. Bidding is open to Bidders from eligible source countries of ADB.<\/li>\n<\/ol>\n<ol start=\"2\">\n<li>The State Agency for Water Resources Services under the Ministry of Agriculture of the Kyrgyz Republic (\u201cthe Employer\u201d) invites sealed bids from eligible Bidders for Off farm canal and ancillary works for Pravaya Vetka Canal Head Regulator and Kara Unkur Sai River Headworks (\u201cthe Works\u201d).<\/li>\n<\/ol>\n<ul>\n<li>Reconstruction of crossing threshold No. 2 and construction of crossing thresholds No. 3 and No. 4 on HTW<\/li>\n<li>Reconstruction of comb dampers on HTW<\/li>\n<li>Repair of the spillway chamber on HTW<\/li>\n<li>Replacement of gate shields and lifts at the head water intake structure of the Kara-Unkur-Sai River<\/li>\n<li>Automation and replacement of electrical equipment<\/li>\n<li>Repair of the dispatching point on HTW<\/li>\n<li>Reconstruction of winter discharge channel from PK 3+50 (bridge) to PK 5+90<\/li>\n<li>Reconstruction of sediment flushing channel from HM 0+00 to HM 1+18 (winter throw)<\/li>\n<\/ul>\n<ol start=\"3\">\n<li>Open competitive bidding will be conducted in accordance with ADB\u2019s Single-Stage: One Envelope bidding procedure and is open to all Bidders from eligible countries as described in the Bidding Document.<\/li>\n<\/ol>\n<ol start=\"4\">\n<li>Only eligible Bidders with the following key qualifications should participate in this bidding:<\/li>\n<\/ol>\n<ul>\n<li>Minimum average annual construction turnover of KGS 185 000 000, calculated as total certified payments received for contracts in progress or completed, within the last 3 years.<\/li>\n<\/ul>\n<ul>\n<li>Participation as a contractor, or subcontractor, in at least one contract that has been successfully or substantially completed within the last 5 years and that is similar to the proposed works, where the value of the Bidder\u2019s participation exceeds KGS 130 000 000.<\/li>\n<\/ul>\n<ol start=\"5\">\n<li>To obtain further information and inspect the bidding documents, Bidders should contact:<\/li>\n<\/ol>\n<p>Attention: Nabiev Nurlan Burhanovich, PIU Director<br \/>\nAddress: 720055, 4A Toktonalieva Street, floor # 3, room # 328<br \/>\nBishkek, Kyrgyz Republic<br \/>\nTel: +996 312 54 90 72<br \/>\nE-mail: ccd-rwrsp@water.gov.kg<\/p>\n<ol start=\"6\">\n<li>To purchase the bidding documents in English, eligible Bidders should<\/li>\n<\/ol>\n<ul>\n<li>write to the address above requesting the Bidding Documents for Rehabilitation Off farm canal and ancillary works for Pravaya Vetka Canal Head Regulator and Kara Unkur Sai River Headworks in Nooken District, Jalal Abad Region. <em>\u00a0<\/em><\/li>\n<li>pay a nonrefundable fee of USD 100 or KGS 8400 by bank transfer to the following account:<\/li>\n<\/ul>\n<table width=\"593\">\n<tbody>\n<tr>\n<td width=\"159\">Name<\/td>\n<td width=\"435\">Project Implementation Unit Climate Change and Disaster-Resilient Water Resources Sector Project<\/td>\n<\/tr>\n<tr>\n<td width=\"159\"><\/td>\n<td width=\"435\"><strong>Currency KGS <\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"159\">TIN<\/td>\n<td width=\"435\">01803199710084<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">BIC<\/td>\n<td width=\"435\">135001<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">Account in KGS<\/td>\n<td width=\"435\">1350108039435913<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">Bank name and address<\/td>\n<td width=\"435\">OJSC Aiyl Bank, 720040, 14, Logvinenko Street, Bishkek, Kyrgyz Republic<\/td>\n<\/tr>\n<tr>\n<td width=\"159\"><\/td>\n<td width=\"435\"><strong>Currency USD<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"159\">INTERMEDIARY BANK<\/td>\n<td width=\"435\">SWIFT: IRVTUS3N<\/p>\n<p>THE BANK OF NEW YORK MELLON, NEW YORK<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">BENEFICIARY BANK<\/td>\n<td width=\"435\">SWIFT: AIYLKG22<\/p>\n<p>ACCOUNT: 30111840000000001224<\/p>\n<p>NAME: AIYL BANK<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">Account in USD<\/td>\n<td width=\"435\">1350108032850522<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ol start=\"7\">\n<li>Deliver your bid<\/li>\n<\/ol>\n<ul>\n<li>to the address: 4A Toktonalieva Street, 3 floor room # 328, Bishkek, Kyrgyz Republic<\/li>\n<li>on or before the deadline: <strong>August 15, 2022 &#8211; 15:00 (Bishkek time). <\/strong><\/li>\n<li>together with a Bid Security as described in the Bidding Document.<\/li>\n<\/ul>\n<p>Bids will be opened immediately after the deadline for bid submission in the presence of Bidders\u2019 representatives who choose to attend.<\/p>\n ","protected":false},"excerpt":{"rendered":"<p>State Agency for Water Resour\u0441es Services under the Ministry of Agriculture of the Kyrgyz Republic Date: July 12, 2022 Loan \u2116 3746 KGZ \/Grant \u2116 0632 KGZ Climate Change and Disaster-Resilient Water<a class=\"moretag\" href=\"https:\/\/water-climate.kg\/?p=1635&#038;lang=en\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7,17],"tags":[],"class_list":["post-1635","post","type-post","status-publish","format-standard","hentry","category-news","category-tenders"],"views":742,"_links":{"self":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/1635","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1635"}],"version-history":[{"count":1,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/1635\/revisions"}],"predecessor-version":[{"id":1636,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/1635\/revisions\/1636"}],"wp:attachment":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1635"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1635"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}