{"id":1706,"date":"2023-05-30T04:47:05","date_gmt":"2023-05-30T04:47:05","guid":{"rendered":"https:\/\/water-climate.kg\/?p=1706"},"modified":"2023-06-02T04:49:23","modified_gmt":"2023-06-02T04:49:23","slug":"invitation-for-bidslot-1-2-on-farm-canal-and-ancillary-works-for-the-pravaya-vetka-irrigation-system","status":"publish","type":"post","link":"https:\/\/water-climate.kg\/?p=1706&lang=en","title":{"rendered":"Invitation for bids:Lot 1, 2 On-Farm canal and Ancillary Works for the Pravaya Vetka Irrigation System"},"content":{"rendered":"<p><strong>Invitation for Bids<\/strong><\/p>\n<p>Water Resour\u0441es Services State Institution under the Ministry of Agriculture of the Kyrgyz Republic<\/p>\n<table class=\"category\">\n<tbody>\n<tr>\n<td width=\"161\"><strong>Date:<\/strong><\/td>\n<td width=\"463\">May 26, 2023<\/td>\n<\/tr>\n<tr>\n<td width=\"161\"><strong>Loan \u2116 3746 KGZ\/ Grant \u2116 0632 KGZ:<\/strong><\/td>\n<td width=\"463\">Climate Change and Disaster-Resilient Water Resources Sector Project<\/td>\n<\/tr>\n<tr>\n<td width=\"161\"><strong>Contract No.:<\/strong><\/td>\n<td width=\"463\">NCB \u2116 CC-SAWR-W-NCB-1 Lot 1, 2 On-Farm canal and Ancillary Works for the Pravaya Vetka Irrigation System<\/td>\n<\/tr>\n<tr>\n<td width=\"161\"><strong>Deadline for Submission of Bids:<\/strong><\/td>\n<td width=\"463\"><strong>June 28, 202<\/strong><strong>3<\/strong><strong>\u00a015:00 (Bishkek time).<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ol>\n<li>The Kyrgyz Republic has received financing from the Asian Development Bank (ADB) toward the cost of Climate Change and Disaster-Resilient Water Resources Sector Project<em>.<\/em>\u00a0Part of this financing will be used for payments under the Contract named above. Bidding is open to Bidders from eligible source countries of ADB.<\/li>\n<li>The Water Resources Services State Institution under the Ministry of Agriculture of the Kyrgyz Republic (\u201cthe Employer\u201d) invites sealed bids from eligible Bidders for On-Farm canal and ancillary works for the Pravaya Vetka Irrigation System. (\u201cthe Works\u201d).<\/li>\n<\/ol>\n<p><strong>Lot # 1<\/strong><\/p>\n<ul>\n<li>Nooken-K WUA<\/li>\n<li>Aral-Say WUA<\/li>\n<li>Taymonku WUA<\/li>\n<li>Sakaldy-Suu WUA<\/li>\n<\/ul>\n<p><strong>Lot # 2<\/strong><\/p>\n<ul>\n<li>Murat-Murap WUA<\/li>\n<li>Shaydan-Kara-Unkur WUA<\/li>\n<li>Aikol-Suu WUA<\/li>\n<li>Kenesh-Suu WUA<\/li>\n<\/ul>\n<p>The project provides for the following types of work:<\/p>\n<ul>\n<li>Concrete lining of the canal with monolithic concrete;<\/li>\n<li>Repair or replacement of concrete lining with monolithic concrete;<\/li>\n<li>Repair, replacement, or construction of control structures on the canal;<\/li>\n<li>Mechanical cleaning of sections of the bed.<\/li>\n<\/ul>\n<ol start=\"3\">\n<li>Open competitive bidding will be conducted in accordance with ADB\u2019s Single-Stage: One Envelope bidding procedure and is open to all Bidders from eligible countries as described in the Bidding Document.<\/li>\n<li>Only eligible Bidders with the following key qualifications should participate in this bidding:<\/li>\n<\/ol>\n<p><strong>Lot # 1<\/strong><\/p>\n<ul>\n<li>Minimum average annual construction turnover of KGS 35\u00a0000 000 calculated as total certified payments received for contracts in progress or completed, within the last 3 years.<\/li>\n<li>Participation as a contractor, or subcontractor, in at least one contract that has been successfully or substantially completed within the last 5 years and that is similar to the proposed works, where the value of the Bidder\u2019s participation exceeds KGS 24\u00a0000 000.<\/li>\n<\/ul>\n<p><strong>Lot # 2<\/strong><\/p>\n<ul>\n<li>Minimum average annual construction turnover of KGS 35\u00a0000 000 calculated as total certified payments received for contracts in progress or completed, within the last 3 years.<\/li>\n<li>Participation as a contractor, or subcontractor, in at least one contract that has been successfully or substantially completed within the last 5 years and that is similar to the proposed works, where the value of the Bidder\u2019s participation exceeds KGS 24\u00a0000 000.<\/li>\n<\/ul>\n<ol start=\"5\">\n<li>To obtain further information and inspect the bidding documents, Bidders should contact:<\/li>\n<\/ol>\n<p>Attention: Nabiev Nurlan Burhanovich, PIU Director<\/p>\n<p>Address: 720055, 4A Toktonalieva Street, floor # 3, room # 328<\/p>\n<p>Bishkek, Kyrgyz Republic<\/p>\n<p>Tel: +996 312 54 90 72<\/p>\n<p>E-mail:\u00a0<span id=\"cloak93907\"><a href=\"mailto:ccd-rwrsp@water.gov.kg\">ccd-rwrsp@water.gov.kg<\/a><\/span><\/p>\n<ol start=\"6\">\n<li>To purchase the bidding documents in English, eligible Bidders should<\/li>\n<\/ol>\n<ul>\n<li>write to the address above requesting the Bidding Documents for On-Farm canal and ancillary works for the Pravaya Vetka Irrigation System, Nooken District, Jalalabad Region.<\/li>\n<li>pay a nonrefundable fee of USD 100 or KGS 8600 for Lots 1,2 by bank transfer to the following account:<\/li>\n<\/ul>\n<table class=\"category\">\n<tbody>\n<tr>\n<td width=\"159\">Name<\/td>\n<td width=\"435\">Project Implementation Unit Climate Change and Disaster-Resilient Water Resources Sector Project<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">&nbsp;<\/td>\n<td width=\"435\"><strong>Currency KGS<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"159\">TIN<\/td>\n<td width=\"435\">01803199710084<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">BIC<\/td>\n<td width=\"435\">135001<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">Account in KGS<\/td>\n<td width=\"435\">1350108039435913<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">Bank name and address<\/td>\n<td width=\"435\">OJSC Aiyl Bank, 720040, 14, Logvinenko Street, Bishkek, Kyrgyz Republic<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">&nbsp;<\/td>\n<td width=\"435\"><strong>Currency USD<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"159\">INTERMEDIARY BANK<\/td>\n<td width=\"435\">SWIFT: IRVTUS3N<\/p>\n<p>THE BANK OF NEW YORK MELLON, NEW YORK<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">BENEFICIARY BANK<\/td>\n<td width=\"435\">SWIFT: AIYLKG22<\/p>\n<p>ACCOUNT: 30111840000000001224<\/p>\n<p>NAME: AIYL BANK<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">Account in USD<\/td>\n<td width=\"435\">1350108032850522<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ol start=\"7\">\n<li>Deliver your bid<\/li>\n<\/ol>\n<ul>\n<li>to the address: 4A Toktonalieva Street, 3 floor room # 328, Bishkek, Kyrgyz Republic<\/li>\n<li>on or before the deadline:\u00a0<strong>June 28, 2023 &#8211; 15:00 (Bishkek time).<\/strong><\/li>\n<li>together with a Bid Security as described in the Bidding Document.<\/li>\n<\/ul>\n<p>Bids will be opened immediately after the deadline for bid submission in the presence of Bidders\u2019 representatives who choose to attend.<\/p>\n<p>&nbsp;<\/p>\n ","protected":false},"excerpt":{"rendered":"<p>Invitation for Bids Water Resour\u0441es Services State Institution under the Ministry of Agriculture of the Kyrgyz Republic Date: May 26, 2023 Loan \u2116 3746 KGZ\/ Grant \u2116 0632 KGZ: Climate Change and<a class=\"moretag\" href=\"https:\/\/water-climate.kg\/?p=1706&#038;lang=en\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":1707,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7,17],"tags":[],"class_list":["post-1706","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-tenders"],"views":871,"_links":{"self":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/1706","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1706"}],"version-history":[{"count":1,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/1706\/revisions"}],"predecessor-version":[{"id":1708,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/1706\/revisions\/1708"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/media\/1707"}],"wp:attachment":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1706"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1706"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1706"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}