{"id":2462,"date":"2024-09-19T04:43:06","date_gmt":"2024-09-19T04:43:06","guid":{"rendered":"https:\/\/water-climate.kg\/?p=2462"},"modified":"2024-09-19T04:44:59","modified_gmt":"2024-09-19T04:44:59","slug":"development-of-the-detailed-engineering-project-for-the-construction-and-restoration-of-five-existing-canals-and-one-ten-day-regulation-basin-located-in-chui-osh-jalal-abad-and-batken-regions","status":"publish","type":"post","link":"https:\/\/water-climate.kg\/?p=2462&lang=en","title":{"rendered":"Development of the detailed engineering project for the construction and  restoration of five existing canals and one ten-day regulation basin located in  Chui, Osh, Jalal-Abad and Batken regions"},"content":{"rendered":"<p><strong>\u00a0<\/strong><strong>Dear Sirs!<\/strong><\/p>\n<ol>\n<li><strong>Country\/<\/strong><strong>Borrower:<\/strong> Kyrgyz Republic<\/li>\n<li><strong>The project name:<\/strong> Climate Change and Disaster-Resilient Water Resources Sector Project. Loan 3746 KGZ \/Grant No. 0632 KGZ<\/li>\n<li><strong>Contact person, name and address of the Executive Agency (EA):<\/strong><\/li>\n<\/ol>\n<p>Water Resources Services under the Ministry of the Water Resources, Agriculture and Processing Industry of the Kyrgyz Republic.<\/p>\n<p>Sokeev A.T. Deputy minister of the Ministry of the Water Resources, Agriculture and Processing Industry of the Kyrgyz Republic-<\/p>\n<p>Director of the Water Resources Services<\/p>\n<p>Kyrgyz Republic, 720055, Bishkek,<\/p>\n<p>4A, Toktonalieva street<\/p>\n<p>Project Implementation Unit of the \u201cClimate Change and Disaster Resilient Water Resources\u201d Sector Project<\/p>\n<p>Nabiev Nurlan, PIU Director<\/p>\n<p>Kyrgyz Republic, 720055, Bishkek,<\/p>\n<p>4a, Toktonaliev street, 3<sup>rd<\/sup> floor, office 328<\/p>\n<p>Telephone: + 996\u00a054-90-72<\/p>\n<p>Fax: + 996\u00a0312 54-91-08<\/p>\n<p>E-mail: <a href=\"mailto:ccd-rwrsp@water.gov.kg\">ccd-rwrsp@water.gov.kg<\/a><\/p>\n<ol start=\"4\">\n<li>The Project Implementation Unit (PIU) \u201cClimate Change and Disaster-Resilient Water Resources Sector Project\u201d for inclusion in the short list forwards a request to consulting companies to submit expression of interest in the selection of a company for rendering consultancy services on &#8220;Development of the detailed engineering project for the construction and restoration of five existing canals and one ten-day regulation basin located in Chui, Osh, Jalal-Abad and Batken regions&#8221;. Detailed description of services is in the Terms of Reference.<\/li>\n<\/ol>\n<p>The PIU will select and engage consulting companies, associations or joint ventures (JV) according to the <em>ADB\u2019s<\/em> <em>Guidelines on the Use of Consultants, <\/em>and other arrangements satisfactory to ADB for the engagement of consultants.<\/p>\n<p>The Consulting firm, association\/JV will be recruited using ADB \u2018s <em>Consultants\u2019 Qualifications Cost Based Selection (QCBS) method<\/em><em>.<\/em> The Employer reserves the right to select one firm with the highest qualifications and competence on the basis of expressions of interest (EI) of applicants or can postpone the process without explanation of any reason.<\/p>\n<p>Interested consulting firms, associations\/JV should submit an information confirming their eligibility to perform services according to the attached form \u00abExpression of Interest of Consulting Companies\u00bb and Terms of Reference for \u2116 SAWR-C-QCBS-2 \u201cDevelopment of the detailed engineering project for the construction and restoration of five existing canals and one ten-day regulation basin located in Chui, Osh, Jalal-Abad and Batken regions\u201d.<\/p>\n<p>An expression of interest with supporting documents shall be submitted by the ADB Consultant Management System <a href=\"http:\/\/cms.adb.org\">http:\/\/cms.adb.org<\/a> and to the following address no later than <strong>October 18, 2024<\/strong><strong>, <\/strong>Kyrgyz Republic, 720055, Bishkek, 4\u0410, Toktonaliev street, floor 3, room no.328 , telephone: (+996) (312) 54-90-72, fax: (+996) (312) 54-91-08, e-mail: <a href=\"mailto:ccd-rwrsp@water.gov.kg\">ccd-rwrsp@water.gov.kg<\/a>, Project Implementation Unit (PIU).<\/p>\n<p>On all the above-mentioned issues applicants can obtain consultation at the above indicated PIU address.<\/p>\n<p><a href=\"https:\/\/water-climate.kg\/wp-content\/uploads\/2024\/09\/TermsOfReferenceDevelopmentOfTheDesign5CanalsAnd1BasinEn.pdf\" target=\"_blank\" rel=\"noopener\">Terms Of Reference (*.pdf)<\/a><\/p>\n<p><strong>Nurlan Nabiev<\/strong><\/p>\n<p><strong>PIU Director<\/strong><strong>\u00a0 <\/strong><\/p>\n ","protected":false},"excerpt":{"rendered":"<p>\u00a0Dear Sirs! Country\/Borrower: Kyrgyz Republic The project name: Climate Change and Disaster-Resilient Water Resources Sector Project. Loan 3746 KGZ \/Grant No. 0632 KGZ Contact person, name and address of the Executive Agency<a class=\"moretag\" href=\"https:\/\/water-climate.kg\/?p=2462&#038;lang=en\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":2463,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7,17],"tags":[],"class_list":["post-2462","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-tenders"],"views":1430,"_links":{"self":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/2462","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2462"}],"version-history":[{"count":2,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/2462\/revisions"}],"predecessor-version":[{"id":2467,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/2462\/revisions\/2467"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/media\/2463"}],"wp:attachment":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2462"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2462"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2462"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}