{"id":2759,"date":"2026-07-13T05:41:55","date_gmt":"2026-07-13T05:41:55","guid":{"rendered":"https:\/\/water-climate.kg\/?p=2759"},"modified":"2026-07-13T05:43:14","modified_gmt":"2026-07-13T05:43:14","slug":"invitation-for-bids-12","status":"publish","type":"post","link":"https:\/\/water-climate.kg\/?p=2759&lang=en","title":{"rendered":"Invitation for Bids"},"content":{"rendered":"<table width=\"631\">\n<tbody>\n<tr>\n<td width=\"121\"><strong>Date:<\/strong><\/td>\n<td width=\"510\">10 July 2026<\/td>\n<\/tr>\n<tr>\n<td width=\"121\"><strong>Grant No.<\/strong><\/p>\n<p><strong>and Title:<\/strong><\/td>\n<td width=\"510\">L4646\/G1041-KGZ: Climate Change and Disaster Resilient Water Resources Sector Project \u2013 additional financing<\/td>\n<\/tr>\n<tr>\n<td width=\"121\"><strong>Contract No. and Title:<\/strong><\/td>\n<td width=\"510\">\u041e\u0421\u0412 \u2116 G-OCB-1: Procurement of specialized repair, operation and maintenance equipment for RUVHs comprising of 3 lots<\/td>\n<\/tr>\n<tr>\n<td width=\"121\"><strong>Deadline for Submission of Bids:<\/strong><\/td>\n<td width=\"510\">August 27, 2026 at 15:00 (Bishkek time)<\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<ol>\n<li>The Kyrgyz Republic has received \ufb01nancing from the Asian Development Bank (ADB) toward the cost of Climate Change and Disaster Resilient Water Resources Sector Project \u2013 additional financing, and it intends to apply part of the proceeds of this \ufb01nancing to payments under the contracts named above. Bidding is open to Bidders from eligible source countries of ADB.<\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<ol start=\"2\">\n<li>Bidders may bid for one or several contracts, as further de\ufb01ned in the Bidding Document. Bidders wishing to offer discounts in case they are awarded more than one contract will be allowed to do so provided those discounts are included in the Bid Submission Sheet.<\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<ol start=\"3\">\n<li>The Water Resources Services under the Ministry of the Water Resources, Agriculture and Processing Industry of the Kyrgyz Republic (\u201cthe Purchaser\u201d) invites sealed bids from eligible Bidders for the \u041e\u0421\u0412 \u2116 G-OCB- 1:<\/li>\n<\/ol>\n<p><strong>\u00a0\u00a0\u00a0 <\/strong>Lot #1 G-OCB-1: Supply of wheeled excavator-loader and wheeled excavator;<\/p>\n<p>Lot #2 G-OCB-1: Supply of manipulators, mixers and dump trucks;<\/p>\n<p>Lot #3 G-OCB-1: Supply of rollers and tractors.<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"4\">\n<li>Open competitive bidding \u2013 International advertisement will be conducted in accordance with ADB\u2019s <a href=\"mailto:https:\/\/www.adb.org\/business\/how-to\/what-bidding-procedures-are-used-adb-financed-projects\">Single-Stage: One Envelope <\/a>procedure and is open to all Bidders from eligible countries as described in the Bidding Document.<\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<ol start=\"5\">\n<li>Only eligible Bidders with the following key quali\ufb01cations de\ufb01ned in the Bidding Document may participate in this bidding:<\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<p>Lot \u2116: 1<\/p>\n<ul>\n<li>Successful completion as main supplier within the\u00a0last 3 (three) years, of at least 2 (two) contracts each valued at 80 % with nature, and complexity similar to the scope of supply equates to <strong>USD <\/strong><strong>950,000.00<\/strong><\/li>\n<li>Minimum average annual turnover of <strong>USD 2,400,000.00<\/strong> calculated as total payments received by the Bidder for contracts completed or under execution over the last 3 years.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Lot \u2116 2<\/p>\n<ul>\n<li>Successful completion as main supplier within the\u00a0last 3 (three) years, of at least 2 (two) contracts each valued at 80 % with nature, and complexity similar to the scope of supply equates to <strong>USD 1,050<\/strong><strong>,000.00. <\/strong><\/li>\n<li>Minimum average annual turnover of <strong>USD 2,600,000.00<\/strong> calculated as total payments received by the Bidder for contracts completed or under execution over the last 3 years.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>Lot \u2116 3<\/p>\n<ul>\n<li>Successful completion as main supplier within the\u00a0last 3 (three) years, of at least 2 (two) contracts each valued at 80 % with nature, and complexity similar to the scope of supply equates to <strong>USD 500<\/strong><strong>,000.00. <\/strong><\/li>\n<li>Minimum average annual turnover of <strong>USD 1,300,000.00<\/strong> calculated as total payments received by the Bidder for contracts completed or under execution over the last 3 years.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<ol start=\"6\">\n<li>To obtain further information and inspect the Bidding Documents, Bidders should contact:<\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<p>Attention: Nabiev Nurlan Burhanovich<\/p>\n<p>Address: 720055, 4A Toktonalieva Street, floor # 3, room # 328<\/p>\n<p>Bishkek, Kyrgyz Republic<\/p>\n<p>Tel: +996 312 54 90 72<\/p>\n<p>E-mail: <a href=\"mailto:ccd-rwrsp@water.gov.kg\">ccd-rwrsp@water.gov.kg<\/a><\/p>\n<p><em>\u00a0<\/em><\/p>\n<ol start=\"7\">\n<li>To purchase the Bidding Documents in English, eligible Bidders should<\/li>\n<\/ol>\n<ul>\n<li>write to the address above requesting the Bidding Documents for \u041e\u0421\u0412 \u2116 G-OCB-1: Procurement of specialized repair, operation and maintenance equipment for RUVHs, comprising of 3 Lots, and<\/li>\n<li>pay a nonrefundable fee of USD100 or KGS 8 700 by bank transfer to the following account<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<table width=\"586\">\n<tbody>\n<tr>\n<td width=\"159\">Name<\/td>\n<td width=\"427\">Climate Change and Disaster-Resilient Water Resources Sector Project &#8211; Additional Financing (&#8220;CCD-RWRSP-AF&#8221; Project)<\/td>\n<\/tr>\n<tr>\n<td width=\"159\"><\/td>\n<td width=\"427\"><strong>Currency KGS <\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"159\">TIN<\/td>\n<td width=\"427\">52412202510550<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">OKPO<\/td>\n<td width=\"427\">31155952<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">BIC<\/td>\n<td width=\"427\">135032<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">Account in KGS<\/td>\n<td width=\"427\">1350138030016252 (KGS)<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">Bank name and address<\/td>\n<td width=\"427\">OJSC Aiyl Bank, 000181, st. Kyiv, 114\/2, Bishkek, Kyrgyz Republic<\/td>\n<\/tr>\n<tr>\n<td width=\"159\"><\/td>\n<td width=\"427\"><strong>Currency USD<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"159\">INTERMEDIARY BANK<\/td>\n<td width=\"427\">SWIFT: IRVTUS3N<\/p>\n<p>The Bank of New York Mellon 1 Wall Street, New York, US-NY 10286<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">BENEFICIARY BANK<\/td>\n<td width=\"427\">SWIFT: AIYLKG22<\/p>\n<p>ACCOUNT: KZ116010011000161744<\/p>\n<p>NAME: OJSC AIYL BANK, Bishkek, Kyrgyz Republic<\/td>\n<\/tr>\n<tr>\n<td width=\"159\">Account in USD<\/td>\n<td width=\"427\">1350138030016151 (USD)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>The document will be sent by e-mail.\u00a0 No liability will be accepted for loss or late delivery.<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"8\">\n<li>Deliver your bid:\n<ul>\n<li>to the address: 4A Toktonalieva Street, 3 floor mini conference room # 308, Bishkek, Kyrgyz Republic<\/li>\n<\/ul>\n<\/li>\n<\/ol>\n<ul>\n<li>on or before the deadline: August 27, 2026 15:00 (Bishkek time)<em>,<\/em> and<\/li>\n<li>together with a Bid Security as described in the Bidding Document.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>Bids will be opened promptly after the deadline for bid submission in the presence of Bidders\u2019 representatives who choose to attend.<\/p>\n<p><em>\u00a0<\/em><\/p>\n ","protected":false},"excerpt":{"rendered":"<p>Date: 10 July 2026 Grant No. and Title: L4646\/G1041-KGZ: Climate Change and Disaster Resilient Water Resources Sector Project \u2013 additional financing Contract No. and Title: \u041e\u0421\u0412 \u2116 G-OCB-1: Procurement of specialized repair,<a class=\"moretag\" href=\"https:\/\/water-climate.kg\/?p=2759&#038;lang=en\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":2,"featured_media":2226,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26,7,17],"tags":[],"class_list":["post-2759","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-events","category-news","category-tenders"],"views":5,"_links":{"self":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/2759","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2759"}],"version-history":[{"count":2,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/2759\/revisions"}],"predecessor-version":[{"id":2761,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/posts\/2759\/revisions\/2761"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=\/wp\/v2\/media\/2226"}],"wp:attachment":[{"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2759"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2759"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/water-climate.kg\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}